Total installed capacity: 103.5 MW
Location: Venezuela
Brief: Interconnection, O&M Implementation, Local Staff Training
About Project
This was an emergency project to provide electricity where there was a need to reinforce the generator sector since a severe drought cause by the “El niño” environmental phenomenon , affected the hydroelectric production in Venezuela.
Our Client’s Challenge
The client need to move and interconnect a barge overhauled in Cacao. They needed help to choose and prepare the serving are. Interconnection to country circuit. Staff training in best O&M Procedures.
Our Approach
This was an emergency project to provide electricity where there was a need to reinforce the generator sector since a severe drought cause by the “El niño” environmental phenomenon , affected the hydroelectric production in Venezuela.
Outcome
The project was the delivered in a record time. Venezuela power sector received 103.5 to battler the electricity issue. Well trained personal keeps the barge going now.