40 MW CCGT In Samana, Dominican Rep.

Construction Inspection, Staff training and O&M Procedures Implementation
Total installed capacity: 40 MW
Location: Samana, Dominican Rep.
Brief: Overhaul rehabilitation of barge and all BOP equipment, build new controls, prepare for sea voyage.

 

About Project

The scope of the work covers complete overhaul rehabilitation of power barge, overhaul every single BOP equipment, new controls system and prepare the barge for sea voyage.

 

Our Client’s Challenge

The client had a second hand barge that needed to be fully restored, all controls needed to be replace with new modern systems. The barge needed to be prepare for sea voyage.

 

Our Approach

After our engineers analyze the barge, we sent required personal to work on barge restore, a second team was sent to work with BOP equipment and system engineers to wonk on new controls system.

 

Outcome

The project was delivered on time and under budget. The client saved significant amount of money on BOP equipment professionally overhauled avoiding the need to buy new ones in the market.

Barge gets safe to its new location, ready for another decade of productivity in electricity generation.