Total installed capacity: 625 MW
Location: Istanbul, Turkey
Brief: Mobilization, Operations and Maintenance, Computer Maintenance, CMMS Implementation, Trainings
About Project
Power ships KPS1, KPS3, KPS4 and KP5 Complete Mobilization to specific site drawings, Create system description manual, operation and maintenance procedures implementation, computers maintenance and management system. CMMS implementation support, administrative manuals set and personnel training.
Our Client’s Challenge
The client need to move four power ships units, including prepare drawing area, interconnection, complete O&M implementation, modern control systems installation and well trained staff.
Our Approach
We analyze each power ship condition by separately. Special team of engineers was brought to ships location to prepare them for mobilization. We schedule systems upgrade while mobilization to save time.
Outcome
Ships were moved and systems upgrade in time. All the ships count now with modern control systems. Higher standards O&M procedures and an excellent trained staff.